The piping project for a nuclear power plant is divided into the following three phases. A correct selection of materials together with calculations and stress analysis must be carried out with a view to minimizing or avoiding possible failures or damages in piping assembling, which could be caused by internal pressure, weight, temperature, oscillation, etc. In order to develop piping engineering, an adequate dimensioning and correct selection of materials must be secured. Piping engineering for nuclear power plant Two, which are concerned with pressurized pipes or steam lines in the nuclear industry, are indexed separately. The range of issues covered represents a balance between current practices and implementation of future international standards. Development of engineering and operation of piping systems in all aspects, including non-metallic materials, are highlighted. The conference ' Piping Engineering and Operation' was organized by the Institution of Mechanical Engineers in November/December 1993 to follow on from similar successful events of 19, which were attended by representatives from all sectors of the piping industry. International Nuclear Information System (INIS)
0 Comments
Leave a Reply. |